- Contact Person : Mr. Liu Terry
- Company Name : Qingdao Friend Plastic Extrusion Technology Co., Ltd.
- Tel : 86-532-86622399
- Fax : 86-532-86622397
- Address : Shandong,Jiaozhou,Qingdao City,West Pingcheng Zhonglu,jiaoxi Industry Zone, jiaoxi Zhen
- Country/Region : China
- Zip : 266300
HDPE Pipe Production Line
The Photo of HDPE Pipe Production Line
The FPEG series of gas / water supply pipe production line is the new pipe production line developed by Friend Company after absorbing advanced technology from Europe, Use of energy-saving and efficient weight measurement of single-screw extruder, coordinate with the iNOEX gravity metering feeding system of Germany, realized extrusion speed and traction speed closed-loop control, high pipe yield, Effective control of the pipe wall thickness. Savings of 3% of the HDPE material. Adopt electromagnetic heating technology to heat the barrel and die can save electricity 30%, heating rate doubled.
Feature of HDPE Pipe Production Line
1. Adopt PLC control and simple operation .
2. Adopt Electric-magnetic heater which can save 40% -60% electric power for customer .
3. All Electric Part (breaker/motor/relay /Inverter and so on ) is Siemens/Schneider/Omron
4. Adopt Gravity Feeding System
5.Material of screw and barrel: 38CrMoAlA, nitrogen quenched which the thickness layer 0.4-0.7mm; Hardness of screw barrel: >940 HV;
6. Unique grooved structure feed bush with force cooling system that is specially designed by Friend co. which can increase output at 15-20%.
7. Variable screw-pitch and double-separate structure screw is specially designed for PE. Comprehensive plasticizing element, ensure the plasticizing effects of materials.
8. The water cooling tank has two vacuum chambers which can improve cooling effect .
9. The water cooling tank has a set of automatically control water temperature and water level . it can save lot of water and improve production efficiency .
10. Haul off and cutting machine is consist of PLC control system .Control is simple/ the operation speed is fast/ saving manpower and time.
Notes:
1. Delivery time: In 60 days after receiving the down payment.
2. Terms of payment: 30% down payment and 70% before delivery.
3. Transport mode: by sea
4. Minimum Order Quantity: 1 set
5. Package: In container
6. This price is valid for 30 days.
7. Guarantee period: 12 months
8. The buyers should afford the installation costs. And the seller does not offer the site installation and debugging.
Equipment List of HDPE Pipe Production Line
NO. | Equipment | Qty. |
1 | single screw extruder | 1set |
2 | mould | 1set |
3 | vacuum sizing water tank | 1set |
4 | spraying cooling water tank | 1set |
5 | haul-off unit | 1set |
6 | Planet cutting machine | 1set |
7 | stacker | 1set |
8 | electric control device | 1set |
9 | spare part | 1set |
Technical Parameter of HDPE Pipe Production Line
Model | Range (MM) | Extruder Model | Mark-line Extruder Model | Extrusion Speed (m/min) | Max.ouput | Total Installed | Overall Dimension |
FPEG-63 | 20-63 | FSJ-50X33 | FSJ-25X25 | 0.2-16 | 120 | 65 | 36X2.2X2.5 |
FPEG-110 | 20-110 | FSJ-65X33 | FSJ-25X25 | 0.2-20 | 220 | 115 | 56X2.2X2.5 |
FPEG-160 | 63-110 | FSJ-75x33 | FSJ-25X25 | 0.2-6 | 300 | 160 | 50X2.2X2.8 |
FPEG-250 | 75-250 | FSJ-80X33 | FSJ-25X25 | 0.2-5 | 400 | 200 | 52x2.2x3.0 |
FPEG-400 | 160-400 | FSJ-90X33 | FSJ-25X25 | 0.2-2 | 550 | 250 | 66X2.2X3.0 |
FPEG-500 | 200-500 | FSJ-100X33 | FSJ-25X25 | 0.1-1 | 700 | 300 | 70X2.3X3.5 |
FPEG-630 | 355-630 | FSJ-120X33 | FSJ-30X25 | 0.1-1 | 900 | 420 | 72X2.3X3.5 |
FPEG-800 | 400-800 | FSJ-135x33 | FSJ-30X25 | 0.08-0.8 | 1200 | 500 | 76X2.5X4.0 |
FPEG-1200 | 800-1200 | FSJ-150X33 | FSJ-30X25 | 0.05-0.5 | 1400 | 650 | 80X3.0X4.0 |
FPEG-1600 | 800-1600 | FSJ-150X33 | FSJ-30X25 | 0.05-0.5 | 1500 | 850 | 80X5.0X6.0 |
The Photo of HDPE Pipe Production Line
HDPE Pipe Production Line